Urban Rail Transit Running Hierarchized Simulation based on Timed Discrete Petri and Matlab under the Background of Industry 4.0

Main Article Content

Yue Zhang

Abstract

This paper, taking Changchun rail transit as an example, proposes a new method to simulate its running that is hierarchized simulation using timed discrete Petri and Simulink/Stateflow. Firstly, this paper uses the timed discrete Petri nets to build Changchun rail transit line 1-4 running model. And then, based on the timed discrete Petri nets model above, this paper also studies hierarchized simulation model by the tool of Simulink/Stateflow, which consists of two layers: the bottom layer is a single line model, and the top layer is a whole line model. In order to realize the rail transit running visualization, the tool of Matlab/App Designer is employed to design monitoring interface for Changchun rail transit line 1-4. This method is scalable and popularized.

Article Details

How to Cite
Zhang, Y. (2021). Urban Rail Transit Running Hierarchized Simulation based on Timed Discrete Petri and Matlab under the Background of Industry 4.0. CONVERTER, 482 - 489. https://doi.org/10.17762/converter.200
Section
Articles