Dynamic Optimization of Inner Dump in Open-Pit Mining With Irregular Boundary

Main Article Content

Haoran Li, et al.

Abstract

In order to maximize the profit of open-pit mining with irregular boundary, a dynamic optimization method of internal drainage field is proposed according to the open-pit mining principle. The method according to the site within the space and the relationship between the volume of debris, there will be no rules state within the cross mining row of open pit mining engineering is divided into three periods, namely: site within the space of stage saturated site, inner space, site in excess phase space; By building the stope - inside the mine production model, will work in mine stope and line contact with the three periods established relationship, analyses the various periods stripping engineering problems, and puts forward the corresponding solutions, and for optimal solution. This method is applied to the henan open-pit mine of hollin, a state power investment group. In another mining period, the internal drainage space is fully utilized, which reduces the area of land expropriation by the external drainage and achieves the purpose of reducing cost and increasing efficiency.

Article Details

How to Cite
et al., H. L. (2021). Dynamic Optimization of Inner Dump in Open-Pit Mining With Irregular Boundary. CONVERTER, 456 - 469. https://doi.org/10.17762/converter.78
Section
Articles