Study on the Shape Optimization of Composite Slope at the End of Irregular Boundary Open-Pit Mine

Main Article Content

Haoran Li, et al.

Abstract

In order to optimize the shape of the compound slope at the end of the open-pit mine under the condition of non-irregular boundary, the compound slope composed of the stope end and the inner dump in the south of the open-pit mine in Pingshuo is studied. Due to the impact of land acquisition, the space of external dump is seriously insufficient, and with the development and change of mining engineering and the influence of geological structure, the problem of compound form optimization and the release and utilization of internal drain space in the south side is generated. Through field investigation and theoretical analysis and numerical analysis method, on the basis of investigating the ore party production status, to establish a 3 d geological model, select two battery profile typical position, using rigid body limit equilibrium method from the perspective of 2 d, in the full study south help shrink battery limit compound stope side slope and mine safety distance, flat width, and the direction of dump active line and the relationship between the stability design of multiple slope configuration scheme, through the various methods of slope stability, enforceability and comparing some important parameters such as displacement capacity, ultimately determine the technology feasible economic and reasonable boundary zone composite slope space form. Based on the above research results, FLAC3D software was used to study the stress-strain relationship inside the slope, revealing the deformation and failure mechanism and stability of the composite slope in the south bound area. The results show that the landslide mode and stability of the composite slope in the south bound area of pingshuoAndaobao open-pit coal mine are mainly controlled by the safe distance between stope and dump and the weak layer of 11 coal floor. According to the design, the economic and reasonable parameters of the composite slope in the south slope shrinkage boundary area are as follows: the safe distance between the stope end side and the dump site is 50m, the width of the dump flat plate is 60m, and the working line Angle of the dump line with the abandonment height of 255m is 125°, the total discard space was95,934,100 m3.

Article Details

How to Cite
et al., H. L. (2021). Study on the Shape Optimization of Composite Slope at the End of Irregular Boundary Open-Pit Mine. CONVERTER, 582 - 596. https://doi.org/10.17762/converter.88
Section
Articles